Conceptual Idea • Design • Permitting • Construction • Completed Project

Ormaza Construction will help you every step of the process.

Conventional / Traditional Wood Frame  |  Steel Framed + Conventional  |  Pre-Engineered Metal Building

Southwest Gas Elko Facility | 20,277 SF

Construction June 2017 – April 2018

Southwest Gas Elko, NV Facility Entrance

Completed Entry

Ormaza Construction Concrete

Foundation

Concrete Masonry

Ariel View of SWG Ormaza New Build

Ariel View Completed

This was a new building with site improvements. The office area is a wood framed structure with a metal roof.

The Warehouse and Shop are CMU with a metal joist system and metal roof. This project was fast paced and finished on schedule.

Total Eyecare - Optical Facility | 11,698 SF

2209 North 5th St. Elko, NV | Construction September 2019 – August 2020

Ribbon Cutting

Pedro Ormaza, Jennifer Back, Pat Walsh of ZGA Architects

Concrete Foundation

Interior Finish, Reception

Wood Framing & Stairs

This project was a design build, new optical building.  It is a wood framed building with a membrane roof.

The main entry is on the first floor and a daylit basement exits to the back of the property. The upstairs houses 12 exam rooms and testing rooms, an optical area, lab, and administrative support area. Downstairs includes, offices, storage, and a large spacious breakroom.

Elko County Jail Addition | 6,500 SF

Construction 2014 - 2015

Footings

Finished Interior Cell Blocks

Concrete Masonry

Handrail Roof Decking

Roof Framing

Roof Framing

Commercial Project | Elko County Jail Men’s and Women’s Housing | Prevailing Wage

Project Included: Masonry, Security Ceilings, Design Build Security System, Structural Steel, Fire Proofing, Mill Work, Metal Walls and Cell Ceilings, Detention Furniture, Epoxy Painting, Security Accessories and Fixtures, Security Doors and Hardware.

Golden Health Medical Center | 16,000 SF

1993 Errecart Blvd. in Elko, NV | Construction 2009 - 2010

Pouring Foundation

Building Exterior with Drive Thru

Golden Health Finished Building Ormaza ConstructionJPG

Completed Building

This project was a design build, new medical building originally constructed for Barrick & Newmont Employees. 

State of Nevada, Office Buildings | 30,000 SF

Construction 2007

Completed Office Complex

Raising Walls

retaining wall landscaping paved parking

Finished Exterior with Landscaping

Ormaza CMU Walls Butler Pre-Engineered Metal Building

CMU Walls & Butler Building

Roof installation

Roof Installation

Two-building general use government office complex for the State of Nevada. Designed by ZGA Architects. Built by Ormaza Construction.

Pre-engineered Butler Building, MR24 Roof, Concrete masonry walls, paved parking & landscape for a complete turnkey office building.

Northeastern Nevada Regional Hospital, Expansion & Remodel

2001 Errecart Blvd. Elko, NV | Construction 2004-2005

Dennis Moore & Pete Ormaza

building protective shielding  Ormaza

Lead filled protective shielding walls

MRI Installation with Crane Ormaza medical remodel

MRI Installation with Crane

MRI Installation with Crane

medical building remodel Ormaza Construction

Mounting Equipment

Constructed a new catheterization laboratory (Cath Lab), removed old MRI and installed a new MRI Machine.

This project included installing leaded sheetrock walls & leaded glass windows for hospital grade protective shielding complete with electrical and all interior finishes.