Conceptual Idea • Design • Permitting • Construction • Completed Project

With decades of experience on Mining Projects, Ormaza Construction brings the experience you need for quality craftsmanship on any size expansion, remodel or new building construction.

Barrick Goldstrike Banshee | 2015

Ventilation Project, underground

Ormaza Construction formed and poured concrete pier supports for underground ventilation system. Fans and ventilation system were set by a crane and bolted down to concrete piers. Ormaza Construction coordinated all electrical including setting and pouring support piers for the E-house.

Barrick Cortez F-Canyon | 2010

Underground dry, wash bay, lube bay, chop shop

39,000 SF. Ormaza Construction was the sub-contractor for SNC Lavalin. Ormaza Construction self-performed the following scopes: steel stud framing, drywall, painting, installation of flooring, cabinetry, metal cabinetry, drop ceilings, offices, lockers, dry baskets, interior finishes for underground dry, wash bay, lube bay, and chop shop. Ormaza Construction also managed all plumbing, mechanical, and electrical scopes.

Barrick Cortez | 2006

Truck Shop Expansion

 

14,000 SF Expansion: Warehouse, light vehicle truck repair shop, lube bay and haul truck tire changing area. Installed reinforced 18” concrete slab with double mat strength for changing haul truck tires.

Barrick Goldstrike | 2013

TCM Leach Project Water Treatment / RO Building

 

Architectural Finishes for a 2-HR rated electrical room, control room, and offices located on 2nd and 3rd floors. Project duration 9 weeks 3,680 SF. Included heavy gage 14 gage steel stud framing, drywall, insulation. Ceiling consisted of double layer of drywall on ceiling., stucco Crete board, and v-decking, all installed by forklift from the exterior of the building.

Newmont Phoenix Copper Leach Project | 2013

Electrowinning Building

 

6,106 SF office space 3-month duration. Architectural finishes for offices, lab, control room, storage areas. Ormaza Construction was the sub-contractor for The Industrial Company (TIC). Ormaza Construction self-performed the following scopes: steel stud framing, drywall, painting, installation of VCT flooring and ceramic tile, cabinetry, metal cabinetry and epoxy work surfaces, T-bar grid ceilings, curtail walls, canopy and storefront system for control room, lockers, doors and hardware.

Newmont Phoenix, Copper Leach Project | 2013

Tank Farm Building

 

2,720 SF office space 4 weeks. Architectural finishes to achieve a fire rating for the Organic Tank Room.  Ormaza Construction was a subcontractor for The Industrial Company (TIC). Project details included heavy gage steel stud framing 20’ high + walls, drywall, fire tape, finish, paint, fire proofing, and doors and hardware.

Ventilation pads

Butler Buildings

Re-roof with Metal Roofs

Value engineering on all projects

Construction management

Budget analysis

Estimating services

Mine Dries

Truck Shop

Warehouse

Concrete

Expansions

Metal Doors

Overhead Doors

 

Providing Quality Work for Decades